One of the window positions waiting for the new windows.
Some of the new spray insulation visible between panels.
Masses of electrical cables for the improved circuits.
A floor drain in one of the wetrooms.
Bunks in a cabin looking towards the aft wetroom and rear cabin.
A new window, a bunk ladder, looking towards new lockers.
Tools sitting on the bench seats in the forward cabin.
Central heating radiator connected and ready for work.
The power saw and workbench soon to be replaced by the galley.